Measure your project

Runs on your device

Your material estimate

Your result

Let’s calculate.

Use the Calculate button to see your result.

Review the method below for assumptions and conventions.

How to use this tool

  1. Enter paved area, compacted thickness, compacted density, waste allowance.
  2. Select Calculate to view the result.
  3. Check the method and assumptions below before using the result.

Input reference and sample values

Use the units and choices shown for each field. Sample values are provided for practice, not as recommendations.

InputFormat and unitsSample
Paved areaNumeric value. Unit: m². Must be greater than zero.200
Compacted thicknessNumeric value. Unit: mm. Must be greater than zero.50
Compacted densityNumeric value. Unit: kg/m³. Must be greater than zero.2400
Waste allowanceNumeric value. Unit: %. Zero or positive. Maximum: 100.10

Result for these sample inputs

26.4 tonnes

Select Try the example in the form to load these values and calculate them again. This replaces the current form inputs. Compare the result with the method and worked explanation below.

The method, explained

Tonnes = area × compacted thickness in metres × density / 1000, with allowance.

A WORKED EXAMPLE

Using paved area = 200 m², compacted thickness = 50 mm, compacted density = 2400 kg/m³, waste allowance = 10 %, the result is 26.4 tonnes. Change these example inputs to match your task; use the method above to check each step.

Understanding your result

Use compacted density for the specified mix. Base course, delivery minimums and site compaction are outside this volume estimate.

What to keep in mind

Use compacted density for the specified mix. Base course, delivery minimums and site compaction are outside this volume estimate. A material-quantity estimate, not a structural design or building-code check. Confirm site measurements, supplier coverage and waste before ordering.

Methodology maintained by ClarityKit. How these tools are built and checked.