How to use this tool
- Enter total footing length, footing width, footing thickness, waste allowance.
- Select Calculate to view the result.
- Check the method and assumptions below before using the result.
Input reference and sample values
Use the units and choices shown for each field. Sample values are provided for practice, not as recommendations.
| Input | Format and units | Sample |
|---|---|---|
| Total footing length | Numeric value. Unit: m. Must be greater than zero. | 30 |
| Footing width | Numeric value. Unit: m. Must be greater than zero. | 0.5 |
| Footing thickness | Numeric value. Unit: m. Must be greater than zero. | 0.25 |
| Waste allowance | Numeric value. Unit: %. Zero or positive. Maximum: 100. | 10 |
Result for these sample inputs
4.125 m³
Select Try the example in the form to load these values and calculate them again. This replaces the current form inputs. Compare the result with the method and worked explanation below.
The method, explained
Volume = total length × width × thickness × (1 + waste/100).
Using total footing length = 30 m, footing width = 0.5 m, footing thickness = 0.25 m, waste allowance = 10 %, the result is 4.125 m³. Change these example inputs to match your task; use the method above to check each step.
What to keep in mind
Sizing is supplied by the user; no soil or structural adequacy is assessed. A material-quantity estimate, not a structural design or building-code check. Confirm site measurements, supplier coverage and waste before ordering.