Construction & home

Brick Mortar Volume Calculator

Estimate mortar volume by subtracting brick volume from a solid wall volume.

Editable waste and coverage assumptionsCheck supplier specifications
Project planner
Project planner

Review dimensions, coverage and waste before ordering.

See the method

Measure your project

Runs on your device

Your material estimate

Your result

Let’s calculate.

Use the Calculate button to see your result.

Review the method below for assumptions and conventions.

How to use this tool

  1. Enter gross solid wall volume, number of bricks, brick length, brick width, brick height, waste allowance.
  2. Select Calculate to view the result.
  3. Check the method and assumptions below before using the result.

Input reference and sample values

Use the units and choices shown for each field. Sample values are provided for practice, not as recommendations.

InputFormat and unitsSample
Gross solid wall volumeNumeric value. Unit: m³. Must be greater than zero.1
Number of bricksNumeric value. Minimum: 1. Maximum: 10000000.500
Brick lengthNumeric value. Unit: mm. Must be greater than zero.200
Brick widthNumeric value. Unit: mm. Must be greater than zero.100
Brick heightNumeric value. Unit: mm. Must be greater than zero.60
Waste allowanceNumeric value. Unit: %. Zero or positive. Maximum: 100.10

Result for these sample inputs

0.44 m³

Select Try the example in the form to load these values and calculate them again. This replaces the current form inputs. Compare the result with the method and worked explanation below.

The method, explained

Wet mortar volume = wall volume − brick count × individual brick volume, then apply allowance.

A WORKED EXAMPLE

Using gross solid wall volume = 1 m³, number of bricks = 500, brick length = 200 mm, brick width = 100 mm, brick height = 60 mm, waste allowance = 10 %, the result is 0.44 m³. Change these example inputs to match your task; use the method above to check each step.

Understanding your result

Solid-volume estimate. Exclude cavities and openings from wall volume. This does not specify cement–sand mix or dry material quantities.

What to keep in mind

Solid-volume estimate. Exclude cavities and openings from wall volume. This does not specify cement–sand mix or dry material quantities. A material-quantity estimate, not a structural design or building-code check. Confirm site measurements, supplier coverage and waste before ordering.

Methodology maintained by ClarityKit. How these tools are built and checked.